Marine Construction Services Project Archive

Project Name: Replace Whitewater Bay Docks

Contractor: OTAK Group, Inc.
Client: National Park Service - Southeast Regional Office
Construction Cost: $778,181

Project Description: OTAK was awarded a contract to provide demolition and disposal of existing dockage associated with the Whitewater Bay Marine timber docks, pier and pilings. Other items included: demolition of the fixed concrete dock and slab and associated timber and piles; demolition of timber pier and piles; and installation of polyethylene isolators and replacement of aluminum channels and angles in the Florida Bay Marina. Specific items involved installation of a total of 71 12" PT wood pilings with vinyl wrap and PVC caps along with the purchase, assembly and installation of Bellingham Floating Docks. OTAK provided equipment, material and labor to install fixed piers using .60 CCA treatments for all structural lumber (joist and stringers). OTAK also obtained permits from the U.S. Army Corps of Engineers and the Florida Department of Environmental Protection and worked under them for the life of the project.