Marine Construction Services Project Archive

Project Name: Replace Beacons at the Port of Miami

Contractor: OTAK Group, Inc.
Client: NAVFAC SE
Construction Cost: $459,100

Project Description: Contractor shall provide all labor, materials, tools and equipment necessary for the removal and proper off-site disposal of five (05) existing articulated beacons and moorings, as well as the procurement and installation of five (05) new articulated beacons and moorings. The new beacons will be deployed in water depths of approximately 40 feet referenced to mean lower low water (mllw) and require a focal height of 25 feet referenced to mean high water (mhw).