Civil Construction Services Project Archive

Project Name: EAF Lot

Contractor: OTAK Group, Inc.
Client: NAVFAC SE
Construction Cost: $601,204

Project Description: Project requires the construction of a laydown area. Area of project is approximately 94,600 square feet. The exact location will be staked out in the field by the Contractor, Blount Island Installation personnel and Mayport FEAD personnel. The lot is to be constructed of crushed stone/concrete topped with 4 inches compacted of asphalt millings. The thickness of the new laydown area will be compacted to 8 inches built on top of any existing improved soils. Total approximate area that will receive 4 inches of millings is 124,300 square feet.